Tuesday, September 22, 2009

2nd floor drywalling continues...

The two drywalling guys made a ton of progress today. They did the bathroom...
(The best thing about the mold/mildew/humidity-resistant drywall in the bathroom is, it's PURPLE.)


They did the east and south facing walls of the bedroom...


And, they finished the hallway into the bedroom.


This is the view from the 5'4" perspective, of that groovalicious bathroom window, from the top of the stairs.


And that same place, as seen from the landing a few feet lower down.

No comments:

Post a Comment