The second floor is happening just like the first floor: the east-facing and west-facing walls are going up first. That's the east-facing wall, above. As with the downstairs, the windows will mostly be on the south and east sides.
Access is up a ladder, and onto the scaffolding...the floor is about chest-high for me once I'm on the scaffolding.
The east-facing wall, from the inside. The three windows over on the right are partially covered in plywood right now; they'll ultimately be taller, as the framing around them indicates.
Hey babe! Behind Kevin is all the slash from having trees taken down yesterday at Oh-Dark-Early.
Here's the west-facing wall. If we hadn't taken those trees down, branches would be smushed up against this wall. Those windows are in the stairwell. Stay tuned for exciting window developments once the master bath gets framed out.
No comments:
Post a Comment